Scope Written by a Vendor
When requirements come from a demo script instead of your process owners, the gaps surface in month five. We map current-state process on the floor and in the finance close before anyone talks about modules.
Codazz is an ERP development company delivering custom ERP and platform implementation for manufacturers, distributors and services businesses — Odoo, ERPNext and Business Central with integrations that reconcile finance, inventory and production.
Share your project details — a senior engineer responds within 4 hours.
Independently audited, certified and built to standards you can check

An ERP development company designs, builds and implements enterprise resource planning software — finance, inventory, purchasing and production in one system. Codazz provides custom ERP development and implementation on Odoo, ERPNext, Business Central and NetSuite, scoped fixed-price after a free operations discovery session.
When requirements come from a demo script instead of your process owners, the gaps surface in month five. We map current-state process on the floor and in the finance close before anyone talks about modules.
Duplicate items, three unit-of-measure conventions and a supplier list with the same vendor spelled five ways will sink a go-live. Data cleansing is a funded workstream in our plans, not an afterthought.
Migration scripts that have only run once run for the first time on your production data. We dry-run the full migration and rehearse the cutover runbook before the real one.
One date where finance, inventory, production and payroll all change at once maximises the blast radius of any wrong assumption. Phased rollout means a mistake costs you one module, not your quarter.
Production planning, BOMs, routings, shop-floor data capture and costing that reconciles to your books instead of an estimate.
Multi-warehouse inventory, lot and serial traceability, EDI trading partners, landed cost and carrier integration.
Shopify, Amazon and B2B portal orders flowing into one inventory and finance system instead of three reconciliations a week.
Job costing, project accounting, scheduling, equipment tracking and progress billing tied to the general ledger.
Revenue past the point where spreadsheets bridge the gaps, and month-end close has become a week-long archaeology exercise.
A previous implementation that never went live, or one that did and nobody trusts the numbers. Remediation is a real service.
ERP, integration & data
Single-entity rollout
Controller-signed
Hypercare through month-end
ERP is an operations project that happens to produce software. The technical build is rarely what goes wrong — scope written from a vendor demo, master data nobody cleaned, and a cutover nobody rehearsed are what go wrong. Codazz starts every ERP engagement by walking the floor and sitting through a finance close, then gives you a costed fit-gap analysis showing exactly what a platform handles natively and what needs building. Sometimes that means custom ERP development. More often it means an Odoo or Business Central implementation with custom modules for the two processes that make you money.
Full-cycle ERP development services — custom ERP software for operations that no product models, plus implementation, customisation, integration and migration on Odoo, ERPNext, Dynamics 365 Business Central and NetSuite.
Purpose-built ERP for operations no boxed product models — finance, inventory, purchasing, production and HR on your own data model.
Odoo, ERPNext, Business Central and NetSuite implementations with fit-gap analysis, data migration, conference-room pilots and phased cutover.
Odoo module development, customisation, migration between versions and performance tuning by developers who work in Odoo weekly.
ERP wired to CRM, e-commerce, EDI partners, carriers, bank feeds and BI — with monitoring so a failed sync alerts instead of hiding.
Move off an unsupported ERP version or a legacy system with reconciled master data and a rehearsed cutover your controller signs off.
Operational dashboards and executive reporting on a warehouse feed, so leadership stops waiting on a monthly spreadsheet pack.
Every erp development engagement is scoped, priced and staffed the same way — so these hold on every project, not just the showcase ones.
We map current-state process with the people doing the work and sit through a finance close before scoping modules. Requirements written from a demo script are how ERP projects end up 40% over budget.
Trial balance, open AR/AP, stock on hand and open orders all tie back to source before go-live, with a reconciliation pack your controller signs. Nothing reaches production until those numbers match.
Each phase is scoped and priced before it starts, so budget overruns require a decision rather than arriving as an invoice.
ERP, integration and data engineers in-house across US-overlapping time zones — enough bench to staff a cutover phase and scale back down without you carrying the headcount.
One process, five stages, fixed milestones. You always know what is happening and what it costs.
We map the business problem, the users and the constraints, then agree what success looks like in numbers.
Flows, interface design and a clickable prototype, so the hard decisions are settled before engineering starts.
Two-week sprints against a fixed scope. You see working software every fortnight, not a status report.
Load testing, security review, migration and a rollout plan — with someone from the build team on call.
Monitoring, iteration and a support SLA. Most clients keep building with us long after go-live.
Pick junior, mid and senior engineers and compare monthly and total cost ranges by region against US/Canada.
We do not just build products — we engineer intelligent, connected, future-proof digital experiences.
Full forward and backward trace for recall readiness and audit
Standard versus actual cost variance visible per work order
Shop-floor and warehouse scanning that works offline
Intercompany transactions, consolidation and FX revaluation
850, 856, 810 and 940 documents mapped and monitored
Reorder points and safety stock driven by actual demand history
Freight, duty and handling apportioned to true item cost
Finite capacity planning against real machine and labour constraints
Approval matrices and SoD controls your auditors will ask about
Automated statement import and matching rules for faster close
Inspection plans, non-conformance handling and CAPA workflows
Deployed to your AWS, Azure or GCP account — or on-premise
Best-in-class tools chosen for performance, reliability, and long-term maintainability.
ERP is the most expensive software decision most mid-market companies make. These are the questions worth asking before you sign anything.
Requirements gathered over video calls miss the workarounds that define your process. Insist on on-site discovery covering the floor, the warehouse and a finance close.
You should receive a document listing every process, whether the platform handles it natively, and what building the gap costs. Without it, scope is a moving target.
Ask where master data cleansing sits in the plan and who does it. If the answer is "the client handles that", the go-live date is already at risk.
A partner who proposes big-bang across every module and site is optimising for their invoice schedule, not your risk.
Partners paid by the vendor recommend the vendor. We take no reseller commission, so the platform recommendation is based on fit and five-year cost.
ERP staffing spikes hard at migration and go-live. Ask how many developers they actually employ — we run 200+ in-house — and who covers your first month-end close.

“Scaling to 500K concurrent users was a non-event with their architecture. Black Friday, not a single crash. I’m never going anywhere else.”
Logistics
An IoT fleet and route-optimization platform running 15K+ daily deliveries with a 98% on-time rate and 25% fuel savings.
Read case study →FinTech
Rebuilt a real-time trading engine for 100K+ users — sub-50ms latency and 99.99% uptime.
Read case study →Healthcare
A HIPAA-compliant patient platform that has handled 200K+ consultations and cut consultation time by 60%.
Read case study →Straight answers on ERP development cost, timelines, custom versus platform, data migration, integration and what actually makes ERP projects fail.
Ask our teamAn ERP development company designs, builds and implements enterprise resource planning software covering finance, inventory, purchasing and production. Codazz provides custom ERP development and implementation on Odoo, ERPNext, Business Central and NetSuite — scoped fixed-price after operations discovery.
Cost depends on module scope, entity count, master data state and integration complexity. Production planning, EDI and warehouse automation add materially. Every phase is scoped fixed-price after a free operations discovery session.
Implement a platform when 70%+ of your process is standard. Build custom when operations are the differentiator or licence costs scale badly. Many clients use a hybrid: platform core plus custom modules for differentiating processes.
Ten to sixteen weeks for a single entity with focused modules. Multi-site rollouts with production planning take six to twelve months, phased so finance and inventory go live first. Custom ERP builds run five to nine months.
Scope from process owners not vendor demos. Fund master data cleansing as a real workstream. Rehearse cutover with dry-run migration and reconciliation. Phase rollout so a wrong assumption costs one module, not a quarter.
Migration is an engineering deliverable with acceptance criteria. Master data is cleaned first, then migrated to staging with reconciliation reports your controller signs — trial balance, open AR/AP, stock on hand tied to source.
Yes. We build an integration layer connecting ERP to CRM, storefronts, EDI partners, carriers, payment gateways and BI — with monitoring so failures alert rather than silently gap inventory.
Yes. Deployment goes into your AWS, Azure or GCP account, or on-premise where data residency requires it. Operational data never leaves your boundary.
How enterprise systems are scoped, secured and rolled out without a big-bang rewrite.
Read article BlogThe build-versus-buy framework we apply in every ERP fit-gap analysis.
Read article BlogThe CRM side of the same problem — and why the integration matters more than either system.
Read articleRelated services and the industries we serve most often.
Tell us what you are trying to build. A senior engineer will come back within one working day with a scope, a timeline and a fixed price.