ERP Development Services We Offer in Edmonton
ERP work here divides into four jobs and conflating them is how programs run over. Implementation and re-implementation means standing up SAP S/4HANA, Oracle Fusion Cloud ERP, Microsoft Dynamics 365 Finance and Operations or Business Central, NetSuite, Acumatica or Epicor with the process design done before configuration and the master data cleaned rather than migrated dirty. Extension means building what the package does not have, which in this region usually means lot and heat genealogy for fabricated steel, batch traceability for food and cannabis, TIER emissions data collection, field ticketing for service crews, and rental asset management for the Nisku equipment fleet. Integration means connecting ERP to the systems that hold the truth: plant historians, laboratory information systems, weigh scales, maintenance and asset management, estimating and project controls, and the payroll and certification records that decide who is allowed on site. Rescue means taking over a stalled implementation, which we scope honestly by auditing the data and the process design before quoting. Every engagement ships a documented month-end close, a cutover runbook and a reconciliation pack the controller signs.
Our ERP Development Development Process
We do not configure anything until the close is understood. The first phase maps how the month actually closes today, where the manual spreadsheets sit, which reconciliations fail and how long each takes, because that is the honest measure of whether the new system worked. That work is done on site. Our head office is in Edmonton, so we can sit in your Fort Saskatchewan or Nisku plant with the controller, the production supervisor and the maintenance planner rather than interviewing them separately over video. Master data comes next, and it is usually the reason projects slip: item masters with duplicate part numbers, customers with three spellings, bills of material that stopped matching the shop floor years ago. We clean it in a staging environment with the business owning the decisions. Configuration and extension run in two-week sprints, each closing with a working demo the controller and a line supervisor both attend. Conference room pilots run against real transaction volume, not sample data. Cutover is rehearsed at least twice, including a full trial balance reconciliation, and go-live is scheduled against your fiscal calendar rather than ours. Hypercare covers a full close cycle before handover.
Operations Discovery
2-3 WeeksWe walk the floor and the finance close with your team to document current-state processes, master data quality, integration points and the reporting that decisions actually depend on.
ERP Architecture & Blueprint
2-4 WeeksWe produce the target-state blueprint: module scope, data model, chart of accounts alignment, permission structure, integration architecture and the platform recommendation with costs.
Build & Configuration
10-20 WeeksModule-by-module build and configuration in agile sprints, with a conference-room pilot at the end of each phase so process owners validate against real transactions.
Data Migration & Testing
3-6 WeeksMaster and transactional data migration with reconciliation reports, plus integration testing, load testing and a parallel run against your existing system where the risk warrants it.
Cutover, Training & Hypercare
2-4 WeeksPhased or big-bang cutover with a rehearsed runbook, role-based training for every department, and an on-site or on-call hypercare period through your first month-end close.
Technologies We Use for ERP Development
Platform selection follows manufacturing mode, entity structure and who administers the system afterward. SAP S/4HANA fits process manufacturers with complex batch and regulatory requirements and the staff to run it. Oracle Fusion Cloud ERP suits large multi-entity organizations with heavy consolidation needs. Dynamics 365 Finance and Operations fits discrete and mixed-mode manufacturers already inside the Microsoft estate, and Business Central covers the mid-market below it. NetSuite and Acumatica suit distribution and project-based services. Epicor remains strong in fabrication and metals. Hosting is decided before the shortlist rather than after it, because a residency clause discovered late can eliminate a product you have already selected: the workable Canadian footprints are AWS in Calgary or Montreal, Azure in Toronto or Quebec City, and Google Cloud in Montreal, and not every ERP vendor offers every one of them. Integration runs on Azure Integration Services, MuleSoft, Boomi or a plain event bus on Kafka depending on scale. Plant connectivity goes through OPC UA gateways and historians such as AVEVA PI, always read-only into ERP. Reporting sits in Power BI or Snowflake rather than inside the ERP. Remote sites north of Edmonton get store-and-forward sync because satellite and LTE links drop.
Other Services We Offer in Edmonton
Looking for a different service? Explore our full range of technology solutions available in Edmonton.
Explore Our ERP Development Specializations
Dive deeper into our specialized erp development offerings.
ERP Development in Other Cities
We deliver erp development solutions across 45 cities in 24 countries. Find a location near you.
Latest Work
Drag to explore or use arrow keys